Case Study

CrossFields - MDU

Name: CrossFields estate London

Units: 365 THP 

Delivery type: Catenary wire via MEWPs and ladders

Connection points: 10 FDPs 

Network points: 4 Underground nodes 

 

All cabling works on the estate were carried out using MEWP (Mobile Elevated Work Platform) techniques and Tetra ladder systems. The project involved 365 units spread across 10 separate apartment blocks. To complete external cabling works at heights of 5 to 7 storeys, we utilised a specialised 'Spider' MEWP, operated by our IPAF-certified teams under the supervision of an on-ground banksman for safety and coordination.

 

Our scope included the installation of fibre optic cabling to both the lounge windows and front doors of the designated buildings, ensuring each unit was prepared for future service activation.

The estate is supported by 10 individual Fibre Distribution Points (FDPs), all of which are connected to four underground fibre nodes within the Hyperoptic Hyperzone network. Prior to activation, all PIA (Physical Infrastructure Access) and civils construction works were completed to enable the estate to go live with fibre service. Final testing of each FDP was performed using power meters to confirm that fibre light levels met the required specifications for customer connectivity.

As a result, 365 residents across the estate now have access to ultra-fast fibre optic broadband through Hyperoptic, ready to support modern digital living.